By using this site, you agree to the Privacy Policy and Commenting Policy.
Accept
Brisbane DevelopmentBrisbane DevelopmentBrisbane Development
  • Areas
    • Brisbane CBD
    • Northern
    • Southern
    • Eastern
    • Western
    • Gold Coast
    • Sunshine Coast
  • Search by Type
    • Residential
    • Residential BTR
    • Commercial
    • Hotel & Resort
    • Brisbane Retail
    • Entertainment / Leisure
    • Infrastructure
    • Concepts
    • Industrial
  • SEQ Development Maps
    • Brisbane Development Map
    • Gold Coast Development Map
  • Major Precincts
    • Brisbane Airport
    • Brisbane 2032 Olympics
    • Northshore Hamilton
    • Queen’s Wharf Precinct
    • Waterfront Brisbane
    • Woolloongabba / Brisbane Live Precinct
Search
  • Advertise
© 2026 Brisbane Development Pty Ltd. All Rights Reserved
Reading: New Cross River Rail Alignment Leads to Boggo Road ‘Downgrade’
Share
Notification Show More
Font ResizerAa
Font ResizerAa
Brisbane DevelopmentBrisbane Development
  • Areas
  • Search by Type
  • SEQ Development Maps
  • Major Precincts
Search
  • Areas
    • Brisbane CBD
    • Northern
    • Southern
    • Eastern
    • Western
    • Gold Coast
    • Sunshine Coast
  • Search by Type
    • Residential
    • Residential BTR
    • Commercial
    • Hotel & Resort
    • Brisbane Retail
    • Entertainment / Leisure
    • Infrastructure
    • Concepts
    • Industrial
  • SEQ Development Maps
    • Brisbane Development Map
    • Gold Coast Development Map
  • Major Precincts
    • Brisbane Airport
    • Brisbane 2032 Olympics
    • Northshore Hamilton
    • Queen’s Wharf Precinct
    • Waterfront Brisbane
    • Woolloongabba / Brisbane Live Precinct
Follow US
  • Advertise
© 2026 Brisbane Development Pty Ltd. All Rights Reserved
Brisbane Development > Project Type > Infrastructure > New Cross River Rail Alignment Leads to Boggo Road ‘Downgrade’
Infrastructure

New Cross River Rail Alignment Leads to Boggo Road ‘Downgrade’

Published: 27 June 2019
3 Comments
Share
5 Min Read
Artist's impression of the Boggo Road station portal
Artist's impression of the Boggo Road station portal
SHARE

Updated documents of the recently revised Cross River Rail alignment show a serious connectivity deficiency at Boggo Road, dashing any hope of a seamless Boggo Road interchange hub.

The new EIS drawings show the revised station portal is now over 120 metres from the existing busway and surface rail overpass access point.

The Cross River Rail Delivery Authority was contacted for comment and denied any changes to the original Environmental Impact Statement (EIS) documents.

“The Boggo Road station has not moved further away from the existing busway and rail platform. It is in a similar location to the Reference Design, meaning there are no interchange impacts.” – Cross River Rail Spokesperson

However, 2011 EIS documents clearly show the northern entry portal of the Boggo Road underground station has moved over 120 metres to the south when compared with updated 2019 EIS documents.

Advertisement
Diagram of new 2019 EIS portal location vs 2011 portal location
Diagram of new 2019 EIS portal location vs 2011 portal location and route connecting passengers would need to take
Artist's impression of the new location of the Boggo Road station portal
Artist’s impression of the new location of the Boggo Road station portal

Transport planning experts compare the move to adding another one to two minutes to a journey time, and questioned why the authority isn’t looking at ‘best practice’ interchange connectivity examples in London or Hong Kong.

The realignment from its original location means that people connecting to the busway network or surface rail would need to do the following:

  • Travel up three sets of escalators to the surface
  • Walk up to 125m to the connecting overpass
  • Walk up to an additional 100m to the railway platform (down another set of stairs)

Set to become ‘SEQ’s second busiest transport interchange by 2036’, one anonymous industry insider questioned why the revised location was chosen and said it resulted in quite poor interconnectivity to the existing busway and rail.

“For a brand new multi-billion dollar infrastructure project, the new Boggo Road portal location makes no sense for interconnectivity of the three stations. I do worry about the final outcome for users at that station, compared to international standards, it is a downgrade from what was planned”.

“What we need is better vertical integration whereby people can directly connect to the existing busway and rail via passageways, or at the very least a more appropriate portal location”.

Advertisement
Artist's impression of the new location of the Boggo Road station portal
Artist’s impression of the new location of the Boggo Road station portal
Map of the Boggo Road precinct
Map of the Boggo Road precinct

According to the CRR Authorities figures, on average, nearly 23,000 people will use the new Boggo Road station by 2036.

Weeks ago it was revealed the alignment would also move the main portal at the Gabba 70m to the west in order to create more green space.

“The Woolloongabba station has moved further west by 70m to deliver a better design outcome and to facilitate the option of enhanced open space in the new Woolloongabba urban precinct once it has been developed.  There are no planned changes to passenger access to the busway.” – Cross River Rail Spokesperson

Additionally, the government announced that the Roma Street Busway station as part of the Brisbane Live redevelopment would be sunk underground as part of a $250 million transformation for seamless connectivity to the existing busway and rail at Roma Street.

A new station plaza is planned to be built on top of the Roma Street busway interchange with underground train and bus levels linked by lifts and escalators.

Artist's impression of Roma Street Busway station moving underground
Artist’s impression of Roma Street Busway station moving underground

Demolition on the Brisbane Transit Centre is expected to begin late 2019.

Advertisement
Designs Revealed For Brisbane’s 63,000 Seat Olympic Stadium At Victoria Park
Albert Street Upgrade Opens Next Month As Mall Navigates A Shifting Retail Landscape
Major Testing Underway for New Adelaide Street Underground Busway Tunnel
Three Options on the Table for Olympic Stadium Location in Victoria Park
Colmslie Wharves to Deliver $100 Million Boost to Brisbane Economy

Sign Up to BD Newsletter

Be keep up! Get the latest breaking development news delivered straight to your inbox.
By signing up, you agree to our Commenting Policy and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print
Share
What do you think?
Love0
Happy0
Surprise0
Sad0
Angry0
Previous Article Artist's impression of 466 Ann Street Design Change Proposed for 466 Ann Street
Next Article Artist’s impression of view from the elevated shared path across the wetlands to Blunder and Hanleys Outlook. Council Unveils Draft Archerfield Wetlands Plan
3 Comments
  • Bernadette Debattista says:
    27 June 2019 at 6:44 am

    Can’t wait to see what BRISBANE has to offer in the future

    Reply
  • anonymous says:
    28 June 2019 at 1:05 pm

    Yep! It’s the contractor who bid for that work and now is trying to do a dodgy! If they get away with it (as it often happens), they will expect to get away with murder in the future.
    Keep the bastards honest!

    Reply
  • Pingback: 2adaptive

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Stay Connected

13kFollowersLike
2kFollowersFollow
6.2kFollowersFollow
3.2kSubscribersSubscribe
LinkedInFollow
Advertisement

Latest News

Architectural rendering of the proposed International Terminal hotel
Brisbane Airport to Expand Hotel Offering with Two New Sites
Brisbane Airport Featured Hotel & Resort
16 April 2026
Vera Hits the Top at Greville: Cedar Woods’ First QLD Apartment Building Topped Out
Northern Residential
12 April 2026
Architectural rendering of the proposed Windsor Inner North Secondary School campus, designed by Hayball for Brisbane Catholic Education.
Five-Building Secondary School Campus Lodged for 22 Grafton Street, Windsor
Education Featured Northern
12 April 2026
Architectural rendering of the Given Terrace streetscape interface of the proposed 2 Latrobe Terrace Paddington development
Keylin And Mackwell Lodge Mixed Use Project With Extensive Rooftop Amenities
Featured Northern Residential
1 April 2026

Polls

Select two infrastructure projects needed most ahead of the Brisbane 2032 Olympics

View Results

Loading ... Loading ...
  • Polls Archive
//

Brisbane’s leading source of free development and infrastructure news reporting across the greater Brisbane area.

Quick Link

  • ADVERTISE WITH USNew
  • PRIVACY POLICY
  • COMMENTING POLICY
  • CONTACT US
  • MY BOOKMARK

Top Categories

  • BRISBANE DEVELOPMENT MAP
  • BRISBANE CBD
  • QUEEN’S WHARF
  • BRISBANE 2032 OLYMPICS
  • SMART GROWTH SERIES

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

Brisbane DevelopmentBrisbane Development
Follow US
© 2026 Brisbane Development Pty Ltd. All Rights Reserved
Join Us!
Subscribe to the BrisbaneDevelopment.com newsletter and never miss our latest news.
Zero spam, Unsubscribe at any time.