On a stretch of previously cleared land at Birkdale, beside almost 39 hectares of protected bushland on the Redlands Coast, Queensland is preparing to build something the state has never had: a purpose-built whitewater venue. The team that will design it has now been chosen.
The Games Independent Infrastructure and Coordination Authority (GIICA) has appointed Queensland-based GHD as Principal Consultant for the Redland Whitewater Centre, following a competitive procurement process. GHD will work in a strategic partnership with Whitewater Parks International (WPI) on the venue, which is expected to host canoe slalom at the Brisbane 2032 Olympic and Paralympic Games.
The pairing brings serious Games pedigree. WPI was the lead designer of the whitewater facilities used at the Tokyo 2020 and Rio 2016 Olympic Games, and key members of its team also contributed to the courses for Sydney 2000 and London 2012. GHD led the design of Auckland’s award-winning Vector Wero Whitewater Park, New Zealand’s first purpose-built whitewater facility. Between them, the two firms cover whitewater course design, hydraulics, water treatment and community recreation facilities.
GHD and WPI bring impressive expertise in the specialty area of design for whitewater facilities, and we are really looking forward to working together to create a fantastic legacy for Redlands, Queensland and Australia.
Simon Crooks, Chief Executive Officer, GIICA
The Redland Whitewater Centre will be just the second facility of its kind in Australia, after the Penrith Whitewater Stadium built for the Sydney 2000 Games, and GIICA expects it to become the country’s northern hub for whitewater events and training. At its heart will be an international-standard whitewater channel for canoe slalom and rafting, set alongside a central lake and a family-friendly lazy river that winds through landscaped lawns.
Around the water, the plans include athlete and community amenities, changerooms, boat storage and a spectator terrace. For the Games, temporary seating will lift capacity to 8,000 spectators, supported by a purpose-built warm-up and training zone for competitors.
GIICA has made clear the venue is being designed for everyday use long after 2032. It will cater for paddlers of all ages and abilities, from elite athletes chasing national team selection to families on a weekend outing, with high-performance and recreational paddle sports, adventure tourism experiences and water play all on the program.
It is also proposed to be Queensland’s first controlled swift water rescue training facility. Emergency services crews will be able to train for floods and other disasters in moving water on demand, and schools will be able to use the venue to build water safety skills. GIICA says income from disaster resilience training, together with tourism and visitation across the wider precinct, is part of what makes the venue financially sustainable for Redland City Council, which will own it after the Games.
The centre is one piece of Redland City Council’s master planned Birkdale Community Precinct, which will also include a new lagoon, beach and waterplay areas, public open space and food and beverage outlets. Together they are intended to create a major recreation and tourism destination on Quandamooka Country, and a new gateway to the Redlands Coast for visitors arriving from Brisbane.
GIICA says the design draws on years of environmental studies on the site, including koala tracking and investigations into groundwater ecosystems, and places the venue on land that has already been cleared. Site investigations began in October, and the project is in its planning and approvals phase, with design now to be led by GHD and WPI and completion anticipated in 2030.
The venue is being delivered by GIICA under the 2032 Delivery Plan, through the $7.1 billion Games Venues Infrastructure Program jointly funded by the Australian and Queensland Governments. GIICA announced the design team for the Logan Indoor Sports Centre on the same day, continuing a run of appointments across the Games program that has included the National Aquatic Centre.
More on the Brisbane 2032 venues
- National Aquatic Centre Design Team Appointed as Brisbane 2032 Project Advances
- It’s Finally Happening: Brisbane’s $1.4 Billion Arena to Start Construction in January
- Work Set To Commence On Brisbane’s 63,000 Seat Olympic Stadium
Project Rundown
| Development Parameter | Proposed Development |
|---|---|
| Project | Redland Whitewater Centre |
| Location | Birkdale Community Precinct, Birkdale QLD 4159 (Redlands Coast, Quandamooka Country) |
| Delivery Authority | GIICA (Games Independent Infrastructure and Coordination Authority) |
| Principal Consultant | GHD |
| Whitewater Design Partner | Whitewater Parks International (WPI) |
| Future Owner | Redland City Council |
| Funding | Australian and Queensland Governments, through the $7.1 billion Games Venues Infrastructure Program |
| Facilities | International-standard whitewater channel for canoe slalom and rafting, central lake, family-friendly lazy river, athlete and community amenities, changerooms, boat storage and a spectator terrace |
| Other Uses | High-performance and recreational paddle sports, adventure tourism, water play, and swift water rescue training for emergency services (proposed as Queensland’s first controlled facility) |
| Games Use | Expected venue for Olympic canoe slalom at Brisbane 2032 |
| Games Capacity | 8,000 spectators with temporary seating |
| Site | Previously cleared land beside almost 39 hectares of protected conservation area |
| Status | Planning and approvals phase; site investigations underway since October 2026 |
| Anticipated Completion | 2030 |
Artist impressions and fly-through video supplied by GIICA; early design concepts only and subject to change.
