By using this site, you agree to the Privacy Policy and Commenting Policy.
Accept
Brisbane DevelopmentBrisbane DevelopmentBrisbane Development
  • Areas
    • Brisbane CBD
    • Northern
    • Southern
    • Eastern
    • Western
    • Gold Coast
    • Sunshine Coast
  • Search by Type
    • Residential
    • Residential BTR
    • Commercial
    • Hotel & Resort
    • Brisbane Retail
    • Entertainment / Leisure
    • Infrastructure
    • Concepts
    • Industrial
  • SEQ Development Maps
    • Brisbane Development Map
    • Gold Coast Development Map
  • Major Precincts
    • Brisbane Airport
    • Brisbane 2032 Olympics
    • Northshore Hamilton
    • Queen’s Wharf Precinct
    • Waterfront Brisbane
    • Woolloongabba / Brisbane Live Precinct
Search
  • Advertise
© 2026 Brisbane Development Pty Ltd. All Rights Reserved
Reading: National Aquatic Centre Design Team Appointed as Brisbane 2032 Project Advances
Share
Notification Show More
Font ResizerAa
Font ResizerAa
Brisbane DevelopmentBrisbane Development
  • Areas
  • Search by Type
  • SEQ Development Maps
  • Major Precincts
Search
  • Areas
    • Brisbane CBD
    • Northern
    • Southern
    • Eastern
    • Western
    • Gold Coast
    • Sunshine Coast
  • Search by Type
    • Residential
    • Residential BTR
    • Commercial
    • Hotel & Resort
    • Brisbane Retail
    • Entertainment / Leisure
    • Infrastructure
    • Concepts
    • Industrial
  • SEQ Development Maps
    • Brisbane Development Map
    • Gold Coast Development Map
  • Major Precincts
    • Brisbane Airport
    • Brisbane 2032 Olympics
    • Northshore Hamilton
    • Queen’s Wharf Precinct
    • Waterfront Brisbane
    • Woolloongabba / Brisbane Live Precinct
Follow US
  • Advertise
© 2026 Brisbane Development Pty Ltd. All Rights Reserved
Brisbane Development > Major Precincts > Brisbane 2032 Olympics > National Aquatic Centre Design Team Appointed as Brisbane 2032 Project Advances
Brisbane 2032 OlympicsFeaturedInfrastructureNorthern

National Aquatic Centre Design Team Appointed as Brisbane 2032 Project Advances

Published: 24 July 2026
2 Comments
Share
4 Min Read
A view of the proposed National Aquatic Centre from the rail corridor, featuring the venue's wave inspired roofline and open, subtropical design. Artist's impression.
A view of the proposed National Aquatic Centre from the rail corridor, featuring the venue's wave inspired roofline and open, subtropical design. Artist's impression.
SHARE

The architectural team behind Brisbane’s future National Aquatic Centre has been revealed, with ARM Architecture and NH Architecture partnering with Brisbane based Arkhefield to design one of the flagship venues for the 2032 Olympic and Paralympic Games.

Unveiled by the Queensland Government to mark six years until the Brisbane 2032 Games, the proposed redevelopment of the heritage listed Centenary Pool would transform the site into a national aquatic hub designed for elite competition, high performance training and year round community use.

The winning design features a flowing roof inspired by the movement of water and wind, while embracing Centenary Pool’s existing heritage listed structures. Rather than dominating the site, the building has been designed to sit within the natural landscape, with the multi level venue stepping down the site’s southern edge to maximise natural light, capture cooling breezes and preserve surrounding parkland.

A view of the proposed National Aquatic Centre from the rail corridor, featuring the venue's wave inspired roofline and open, subtropical design. Artist's impression.
A view of the proposed National Aquatic Centre from the rail corridor, featuring the venue’s wave inspired roofline and open, subtropical design. Artist’s impression.

Once completed, the National Aquatic Centre would include a main competition arena, a secondary arena, three new covered pools, high performance training facilities, a gymnasium, office space and athlete support facilities. The redevelopment would also retain Centenary Pool’s existing outdoor swimming facilities, creating a venue capable of hosting international competition while remaining accessible to the community beyond the Games.

Advertisement
The National Aquatic Centre has been designed to integrate with the natural landscape while retaining Centenary Pool's heritage listed structures. Artist's impression.
The National Aquatic Centre has been designed to integrate with the natural landscape while retaining Centenary Pool’s heritage listed structures. Artist’s impression.

The architectural consortium brings together firms with extensive experience delivering major public infrastructure projects across Australia. ARM Architecture previously designed Perth’s RAC Arena and led the redevelopment of the Sydney Opera House Concert Hall, while NH Architecture delivered the transformation of Melbourne Park. Brisbane based Arkhefield has completed projects including South Bank’s River Quay precinct and the Waterfront Brisbane redevelopment.

Aquatic architecture specialist Liquid Blu also forms part of the design team, bringing experience from projects including the Yeppoon Lagoon, Palm Beach Aquatic and Community Centre and Gympie Aquatic Recreation Centre.

According to the Games Independent Infrastructure and Coordination Authority (GIICA), the winning concept was selected following a six month competitive design process. GIICA Chair Stephen Conry said the design was chosen for its strong connection to Brisbane’s landscape and its integration with the heritage significance of the existing Centenary Pool.

National Aquatic Centre concept showing the retained outdoor Centenary Pool alongside the proposed indoor competition arenas and community facilities. Artist's impression.
National Aquatic Centre concept showing the retained outdoor Centenary Pool alongside the proposed indoor competition arenas and community facilities. Artist’s impression.

While design work progresses, procurement for the construction contract is also advancing. Four contractors have been shortlisted to submit bids to deliver the project, with the field expected to be reduced to two builders in the coming weeks before a preferred contractor is selected in early 2027.

GIICA is scheduled to take possession of the Centenary Pool site on 1 September 2026, allowing early works to commence ahead of major construction.

Advertisement

The Queensland Government said the design and construction procurement processes are being undertaken in parallel to maintain progress towards the Brisbane 2032 delivery program.

Beyond its role during the Olympic and Paralympic Games, the National Aquatic Centre is intended to become Australia’s premier venue for aquatic sports, supporting elite athlete development, national and international events, and year round public access. The project would establish a long term aquatic legacy while preserving one of Brisbane’s most significant historic swimming venues.

Construction Starts on Goldfields’ $280 Million Tower in Fortitude Valley
Bureau Proberts Designs a Nine Storey Tower of Family-Sized Apartments for Kangaroo Point
Irvine Lodges the Masterplan to Bring Toombul Back as a Flood-Resilient Town Centre
IFM Proposes Regent Lane Precinct with 290 Apartments, a New Hotel and Public Rooftop Garden
The Arbory Stage Two: An Eight Storey Office Building Planned Beside St Patricks Church in Fortitude Valley

Sign Up to BD Newsletter

Be keep up! Get the latest breaking development news delivered straight to your inbox.
By signing up, you agree to our Commenting Policy and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print
Share
What do you think?
Love15
Happy1
Surprise1
Sad1
Angry0
Previous Article Render of the proposed 18 storey tower at 17 to 21 Maud Street, Newstead, by Bureau Proberts An 18 Storey, 64 Apartment Tower Lodged for Maud Street, Newstead
Next Article Artist's impression of the 47 storey Little National Brisbane tower at 30 Albert Street DOMA Group Reboots 30 Albert Street as a 47 Storey Little National Tower
2 Comments
  • Greg says:
    24 July 2026 at 12:47 pm

    Based on the renders, the new sections will be taking up space just North-East of the existing Centenary Aquatic Centre, closer to Bowen Bridge road and the Ekka. So they really are expecting patrons to walk from Exhibition station. Here’s hoping someone’s thought ahead and are planning a (southern end) pedestrian underpass beneath Bowen Bridge road.

    I thought it would have made sense to build in the opposite direction I.e .absorb the existing carpark space and tennis courts, which would reduce the number of trees needing to be culled for construction.

    It’s a bit of a shame that they aren’t extending the York’s Hollow land bridge (over the CBD & train lines) as part of the design. That would have clawed back lost parkland space and also improved access from Exhibition station to the new stadium.

    Reply
  • Loona says:
    27 July 2026 at 2:09 pm

    Absolutely stunning design, I love it

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Stay Connected

13kFollowersLike
2kFollowersFollow
6.2kFollowersFollow
3.2kSubscribersSubscribe
LinkedInFollow
Advertisement

Latest News

Render of the 32 storey AVVA Broadbeach tower on Anne Avenue
Construction Starts on Bassar Group’s $180 Million AVVA Broadbeach Tower
Gold Coast Residential
12 October 2026
Render of the 42 storey 101 OBR Residences tower in Broadbeach
Sunland Returns With the $390 Million, 42 Storey 101 OBR Residences in Broadbeach
Featured Gold Coast Residential
28 September 2026
Aerial render of the new Western Grandstand at North Ipswich Reserve
Construction Starts on North Ipswich Reserve’s $40 Million Western Grandstand
Brisbane 2032 Olympics Entertainment / Leisure Infrastructure Western
25 September 2026
Aerial photograph of Oria looking towards the Brisbane CBD
Spring Hill Apartment Values Overtake Houses as Oria’s Facade Revealed Opposite Olympic Stadium Site
Northern Residential
22 September 2026

Polls

Select two infrastructure projects needed most ahead of the Brisbane 2032 Olympics

View Results

Loading ... Loading ...
  • Polls Archive
//

Brisbane’s leading source of free development and infrastructure news reporting across the greater Brisbane area.

Quick Link

  • ADVERTISE WITH USNew
  • PRIVACY POLICY
  • COMMENTING POLICY
  • CONTACT US
  • MY BOOKMARK

Top Categories

  • BRISBANE DEVELOPMENT MAP
  • BRISBANE CBD
  • QUEEN’S WHARF
  • BRISBANE 2032 OLYMPICS
  • SMART GROWTH SERIES

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

Brisbane DevelopmentBrisbane Development
Follow US
© 2026 Brisbane Development Pty Ltd. All Rights Reserved
Join Us!
Subscribe to the BrisbaneDevelopment.com newsletter and never miss our latest news.
Zero spam, Unsubscribe at any time.