By using this site, you agree to the Privacy Policy and Commenting Policy.
Accept
Brisbane DevelopmentBrisbane DevelopmentBrisbane Development
  • Areas
    • Brisbane CBD
    • Northern
    • Southern
    • Eastern
    • Western
    • Gold Coast
    • Sunshine Coast
  • Search by Type
    • Residential
    • Residential BTR
    • Commercial
    • Hotel & Resort
    • Brisbane Retail
    • Entertainment / Leisure
    • Infrastructure
    • Concepts
    • Industrial
  • SEQ Development Maps
    • Brisbane Development Map
    • Gold Coast Development Map
  • Major Precincts
    • Brisbane Airport
    • Brisbane 2032 Olympics
    • Northshore Hamilton
    • Queen’s Wharf Precinct
    • Waterfront Brisbane
    • Woolloongabba / Brisbane Live Precinct
Search
  • Advertise
© 2026 Brisbane Development Pty Ltd. All Rights Reserved
Reading: Work Set To Commence On Brisbane’s 63,000 Seat Olympic Stadium
Share
Notification Show More
Font ResizerAa
Font ResizerAa
Brisbane DevelopmentBrisbane Development
  • Areas
  • Search by Type
  • SEQ Development Maps
  • Major Precincts
Search
  • Areas
    • Brisbane CBD
    • Northern
    • Southern
    • Eastern
    • Western
    • Gold Coast
    • Sunshine Coast
  • Search by Type
    • Residential
    • Residential BTR
    • Commercial
    • Hotel & Resort
    • Brisbane Retail
    • Entertainment / Leisure
    • Infrastructure
    • Concepts
    • Industrial
  • SEQ Development Maps
    • Brisbane Development Map
    • Gold Coast Development Map
  • Major Precincts
    • Brisbane Airport
    • Brisbane 2032 Olympics
    • Northshore Hamilton
    • Queen’s Wharf Precinct
    • Waterfront Brisbane
    • Woolloongabba / Brisbane Live Precinct
Follow US
  • Advertise
© 2026 Brisbane Development Pty Ltd. All Rights Reserved
Brisbane Development > Major Precincts > Brisbane 2032 Olympics > Work Set To Commence On Brisbane’s 63,000 Seat Olympic Stadium
Brisbane 2032 OlympicsEntertainment / LeisureFeatured

Work Set To Commence On Brisbane’s 63,000 Seat Olympic Stadium

Brisbane Olympic Stadium - Victoria Park

Published: 25 March 2026
2 Comments
Share
3 Min Read
Architectural rendering of the internal AFL configuration of the proposed Brisbane Olympic Stadium at Victoria Park.
Architectural rendering of the internal AFL configuration of the proposed Brisbane Olympic Stadium at Victoria Park.
SHARE

Construction is set to begin on Brisbane’s main Olympic stadium at Victoria Park, marking a major milestone in the city’s preparations for the 2032 Olympic and Paralympic Games.

The proposed 63,000 seat stadium will be delivered as the centrepiece venue for the Games, hosting opening and closing ceremonies as well as athletics events, before transitioning into Brisbane’s primary venue for cricket and AFL following the event.

Early works, including geotechnical investigations and site preparation, are already underway, with full earthworks expected to commence in 2026 as part of the broader delivery timeline.

The project is currently estimated at approximately $3.8 billion, forming a significant component of Queensland’s broader $7.1 billion Olympic venue infrastructure program.

Advertisement
Architectural rendering of the internal cricket configuration of the proposed Brisbane Olympic Stadium at Victoria Park.
Architectural rendering of the internal cricket configuration of the proposed Brisbane Olympic Stadium at Victoria Park.
Architectural rendering of the proposed Brisbane Olympic Stadium during a concert
Architectural rendering of the proposed Brisbane Olympic Stadium during a concert

Plans for the stadium were confirmed in 2025 following a state-led infrastructure review, which identified Victoria Park as the preferred location for the city’s main Games venue.

The stadium is being designed by a consortium including Cox Architecture, Hassell and Japan-based Azusa Sekkei, with the team drawing on experience from major Australian venues such as Optus Stadium and Adelaide Oval.

According to project documentation, the venue would feature a large open-air bowl with tiered seating designed to maximise sightlines and spectator experience, alongside a roof structure intended to provide shading suited to Brisbane’s climate.

The broader Victoria Park precinct is also expected to accommodate additional Olympic infrastructure, including the National Aquatic Centre and associated public realm upgrades, positioning the site as a long-term sporting and recreation hub for the inner city.

Architectural aerial rendering showing the Victoria Park Olympic precinct and its connection to the Brisbane CBD and surrounding transport network.
Architectural aerial rendering showing the Victoria Park Olympic precinct and its connection to the Brisbane CBD and surrounding transport network.

Following the Games, the stadium would replace the Gabba as Brisbane’s primary venue for major sporting events, with the existing Gabba site slated for redevelopment into a residential precinct.

Advertisement

The project has generated ongoing debate, particularly in relation to the use of Victoria Park, which holds cultural significance and has been the subject of community and heritage concerns.

Despite this, the Queensland Government has indicated the project will proceed, with construction activity expected to accelerate in the lead up to the 2032 Games.

Frank Developments Lodges 28 Storey Avela at the Breakfast Creek Corner
Banksia: Zephyr and Joe Adsett Lodge a Wildflower Inspired 18 Storey Tower for Kangaroo Point
IFM Lodges a Woods Bagot Revamp of the Retail Galleries Beneath the InterContinental Brisbane
Lendlease to Reshape the South Brisbane Riverfront With 4,000 Homes at the Former Visy Site
TRK Lodges a Koichi Takada Designed Tower of 189 Apartments for Fortitude Valley

Sign Up to BD Newsletter

Be keep up! Get the latest breaking development news delivered straight to your inbox.
By signing up, you agree to our Commenting Policy and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print
Share
What do you think?
Love13
Happy1
Surprise0
Sad0
Angry1
Previous Article Architectural renderings of the proposed Brisbane Arena at the Gabba Gabba Set For Major Transformation Into Entertainment And Housing Precinct
Next Article Architectural rendering of Buranda TOD Stage 2 showing The Terraces tower and podium with The Garden House and The Pavilion affordable housing buildings in the background, Woolloongabba Wee Hur Lodges Major Changes to Buranda TOD Stage 2 in Woolloongabba
2 Comments
  • William Story says:
    26 March 2026 at 11:56 am

    My thoughts are:
    – Stairs down to Main St look too narrow for the volume of foot traffic.
    – Railing is missing on the Wheelchair ramp. 
    – Where are the shade trees? This area would be scorching in the height of summer.
     – Could be more places to sit, wait and meet friends. 

    Reply
  • Trina says:
    26 March 2026 at 9:55 pm

    i truly hope those needing accessible seating DO have legitimate and uinimpeded views. So many venues place wheelchairs users in extremely inappropriate locations, as an afterthought right at the back, especially for sporting venues where line of sight is non existent the minute the row of able bodied patrons in front stands up or people can simply just walk and stand in from of the wheelchair viewing area. In 2026 this is completely unacceptable especially in a newly constructed venue. Wheelchair seating platforms should be raised higher so this simply does not occur.

    As many venues end up serving a dual purpose for other events such as concerts, please don’t make our disability community a secondary thought when it comes to the patron experience. Would you want to buy tickets and see nothing?

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Stay Connected

13kFollowersLike
2kFollowersFollow
6.2kFollowersFollow
3.2kSubscribersSubscribe
LinkedInFollow
Advertisement

Latest News

Render of Flow Residences overlooking Rainbow Bay and the Snapper Rocks surf break
Flow Residences: a Rainbow Bay Apartment Resells Off Market for $7.4 Million
Gold Coast Residential
3 July 2026
Render of Evergreen Sherwood apartments viewed across landscaped gardens and parkland
Pradella Launches Evergreen Sherwood, a Boutique Parkside Community of 76 Homes
Residential Western
30 June 2026
A close view of the podium corner, showing the masonry brick lattice screens, the heavy columns and the stepped, terraced greenery above each screen. Render by Bureau Proberts.
Bureau Proberts’ 28 Storey Tower for 9 Longland Street: 76 Apartments and Three Rooftop Gardens
Featured Northern Residential
20 June 2026
Suncorp Stadium new wraparound LED videoboard concept with fireworks
Suncorp Stadium’s Largest Upgrade in 23 Years: 360-Degree LED Ribbon, Terrace Bars and ‘Tennis-Court’ Facade Screens
Brisbane 2032 Olympics Infrastructure Western
18 June 2026

Polls

Select two infrastructure projects needed most ahead of the Brisbane 2032 Olympics

View Results

Loading ... Loading ...
  • Polls Archive
//

Brisbane’s leading source of free development and infrastructure news reporting across the greater Brisbane area.

Quick Link

  • ADVERTISE WITH USNew
  • PRIVACY POLICY
  • COMMENTING POLICY
  • CONTACT US
  • MY BOOKMARK

Top Categories

  • BRISBANE DEVELOPMENT MAP
  • BRISBANE CBD
  • QUEEN’S WHARF
  • BRISBANE 2032 OLYMPICS
  • SMART GROWTH SERIES

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

Brisbane DevelopmentBrisbane Development
Follow US
© 2026 Brisbane Development Pty Ltd. All Rights Reserved
Join Us!
Subscribe to the BrisbaneDevelopment.com newsletter and never miss our latest news.
Zero spam, Unsubscribe at any time.