By using this site, you agree to the Privacy Policy and Commenting Policy.
Accept
Brisbane DevelopmentBrisbane DevelopmentBrisbane Development
  • Areas
    • Brisbane CBD
    • Northern
    • Southern
    • Eastern
    • Western
    • Gold Coast
    • Sunshine Coast
  • Search by Type
    • Residential
    • Residential BTR
    • Commercial
    • Hotel & Resort
    • Brisbane Retail
    • Entertainment / Leisure
    • Infrastructure
    • Concepts
    • Industrial
  • SEQ Development Maps
    • Brisbane Development Map
    • Gold Coast Development Map
  • Major Precincts
    • Brisbane Airport
    • Brisbane 2032 Olympics
    • Northshore Hamilton
    • Queen’s Wharf Precinct
    • Waterfront Brisbane
    • Woolloongabba / Brisbane Live Precinct
Search
  • Advertise
© 2025 Brisbane Development Pty Ltd. All Rights Reserved
Reading: Stage 1 of Mirvac’s Waterfront Development Nearing Completion
Share
Sign In
Notification Show More
Font ResizerAa
Font ResizerAa
Brisbane DevelopmentBrisbane Development
  • Areas
  • Search by Type
  • SEQ Development Maps
  • Major Precincts
Search
  • Areas
    • Brisbane CBD
    • Northern
    • Southern
    • Eastern
    • Western
    • Gold Coast
    • Sunshine Coast
  • Search by Type
    • Residential
    • Residential BTR
    • Commercial
    • Hotel & Resort
    • Brisbane Retail
    • Entertainment / Leisure
    • Infrastructure
    • Concepts
    • Industrial
  • SEQ Development Maps
    • Brisbane Development Map
    • Gold Coast Development Map
  • Major Precincts
    • Brisbane Airport
    • Brisbane 2032 Olympics
    • Northshore Hamilton
    • Queen’s Wharf Precinct
    • Waterfront Brisbane
    • Woolloongabba / Brisbane Live Precinct
Have an existing account? Sign In
Follow US
  • Advertise
© 2024 Brisbane Development Pty Ltd. All Rights Reserved
Brisbane Development > Development Areas > Eastern > Stage 1 of Mirvac’s Waterfront Development Nearing Completion
4006 - Newstead, New Farm, Fortitude ValleyEastern

Stage 1 of Mirvac’s Waterfront Development Nearing Completion

Published: 6 July 2010
No Comments
Share
3 Min Read
SHARE

As stage one of Mirvac’s Waterfront development nears completion, stage two is powering ahead.

Waterfront, which is being developed by Mirvac is progressively taking shape in one of Brisbane’s newest inner city regeneration areas. Stage one of Mirvac’s Waterfront development includes two buildings – Pier South, a five storey building and Pier North, an eight storey building.

This first stage which can now be seen from Kingsford Smith Drive is scheduled to be completed by the end of 2010, with residents expected to start moving in early 2011. 

As shown in the image above, landscaping is currently underway and will include 5 hectares of public parkland as well as an artificial lake which will surround Pier South.

Advertisement

The quality of internal fit outs in Waterfront is nothing short of amazing. Mirvac has put a lot of time and effort into ensuring a luxury product unlike anywhere else in the Brisbane residential market.

The developer uses its own interior designers in mostly all of their projects and has appointed a well known New Farm-based interior decorator Black and Spiro to furnish the display centre. Pier South houses some of Brisbane’s last remaining direct waterfront apartments, where there are uninterrupted views of the Brisbane River.

It also houses the development’s most premium apartments, including the Pier South penthouse, which was sold for around $14 million dollars upon first release.

Stage 2 is being called ‘Park’ (shown second from the right above) due to its outlook over the planned parkland. This building is 16 storeys high with ground level cafes, restaurants and convenience retail outlets.

Apartments in this tower are priced at $495,000 for one bedroom units to $1.6 million for pavilion apartments and are recording strong sales, likewise for stage one.

Advertisement

While stage one (Pier North & South) nears completion, construction of stage two ‘Park’ has now commenced, with basement excavation underway. All Waterfront apartments come with car spaces, however with the new addition of Brisbane City Council’s frequent City Glider service from West End to Newstead, transport options in this fast growing area are plentiful.

Mirvac has future plans for further new stages with building heights from 20 storeys. The Brisbane City Council’s recent neighbourhood plan revisions have allowed development of taller buildings, which in turn has increased the scale of the parkland, while reducing building footprints.

There is no doubt that Mirvac has a strong following and loyal client base due to the high degree of quality and design which has been engineered into every apartment. For more info, visit: http://www.mirvac.com/development/waterfront/

Advertisement

Keep updated with Brisbane development news, right here on BrisbaneDevelopment.com

New Five-Storey Mixed-Use Development Proposed for Wynnum
Mosaic’s Second Kangaroo Point Project Secures $205M in Pre-Sales
Approval Granted for 22-Storey Residential Tower at Kangaroo Point
Electrolux Distribution Hub Wins Top Sustainability Honour
Construction Begins on $310 Million ‘The Bedford’ Mixed-Use Project in Kangaroo Point
TAGGED:1constructiondevelopmentmirvacnewsteadoneparkriverriverpartstagewaterfront

Sign Up to BD Newsletter

Be keep up! Get the latest breaking development news delivered straight to your inbox.
By signing up, you agree to our Commenting Policy and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print
Share
What do you think?
Love0
Happy0
Surprise0
Sad0
Angry0
Previous Article Lend Lease’s RNA Showgrounds Proposal
Next Article James Street 2013 – A look into M&A
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Stay Connected

13kFollowersLike
2kFollowersFollow
6.2kFollowersFollow
3.2kSubscribersSubscribe
LinkedInFollow
Advertisement

Latest News

Architectural rendering of the external built form of the proposed Spring House project.
Pellicano Lodges Plans For Build-To-Rent Tower In Spring Hill
Featured Northern Residential BTR
6 November 2025
Indicative location map highlighting 176 Montague Road within the broader South Bank expansion precinct.
176 Montague Road Listed Amid South Brisbane’s Next Wave of Development
Industry Content Southern
6 November 2025
Architectural rendering of the podium planting and ground-level arrival experience of the proposed Lucia Riverfront project.
McNab’s New Riverfront Project Lucia Launches in Highgate Hill
Industry Content Western
3 November 2025
Architectural rendering of the external built form of the proposed Peel Street Residences project.
Finegrain Group Submits DA For Sculpted High-Rise In Kurilpa Precinct
4101 - South Bank, South Brisbane, West End Featured Residential Southern
24 October 2025

Polls

Select two infrastructure projects needed most ahead of the Brisbane 2032 Olympics

View Results

Loading ... Loading ...
  • Polls Archive
//

Brisbane’s leading source of free development and infrastructure news reporting across the greater Brisbane area.

Quick Link

  • ADVERTISE WITH USNew
  • PRIVACY POLICY
  • COMMENTING POLICY
  • CONTACT US
  • MY BOOKMARK

Top Categories

  • BRISBANE DEVELOPMENT MAP
  • BRISBANE CBD
  • QUEEN’S WHARF
  • BRISBANE 2032 OLYMPICS
  • SMART GROWTH SERIES

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

Brisbane DevelopmentBrisbane Development
Follow US
© 2025 Brisbane Development Pty Ltd. All Rights Reserved
Join Us!
Subscribe to the BrisbaneDevelopment.com newsletter and never miss our latest news.
Zero spam, Unsubscribe at any time.