By using this site, you agree to the Privacy Policy and Commenting Policy.
Accept
Brisbane DevelopmentBrisbane DevelopmentBrisbane Development
  • Areas
    • Brisbane CBD
    • Northern
    • Southern
    • Eastern
    • Western
    • Gold Coast
    • Sunshine Coast
  • Search by Type
    • Residential
    • Residential BTR
    • Commercial
    • Hotel & Resort
    • Brisbane Retail
    • Entertainment / Leisure
    • Infrastructure
    • Concepts
    • Industrial
  • SEQ Development Maps
    • Brisbane Development Map
    • Gold Coast Development Map
  • Major Precincts
    • Brisbane Airport
    • Brisbane 2032 Olympics
    • Northshore Hamilton
    • Queen’s Wharf Precinct
    • Waterfront Brisbane
    • Woolloongabba / Brisbane Live Precinct
Search
  • Advertise
© 2025 Brisbane Development Pty Ltd. All Rights Reserved
Reading: Final Layer of Brisbane Airport’s New Runway Has Commenced
Share
Sign In
Notification Show More
Font ResizerAa
Font ResizerAa
Brisbane DevelopmentBrisbane Development
  • Areas
  • Search by Type
  • SEQ Development Maps
  • Major Precincts
Search
  • Areas
    • Brisbane CBD
    • Northern
    • Southern
    • Eastern
    • Western
    • Gold Coast
    • Sunshine Coast
  • Search by Type
    • Residential
    • Residential BTR
    • Commercial
    • Hotel & Resort
    • Brisbane Retail
    • Entertainment / Leisure
    • Infrastructure
    • Concepts
    • Industrial
  • SEQ Development Maps
    • Brisbane Development Map
    • Gold Coast Development Map
  • Major Precincts
    • Brisbane Airport
    • Brisbane 2032 Olympics
    • Northshore Hamilton
    • Queen’s Wharf Precinct
    • Waterfront Brisbane
    • Woolloongabba / Brisbane Live Precinct
Have an existing account? Sign In
Follow US
  • Advertise
© 2024 Brisbane Development Pty Ltd. All Rights Reserved
Brisbane Development > Major Precincts > Brisbane Airport > Final Layer of Brisbane Airport’s New Runway Has Commenced
Brisbane Airport

Final Layer of Brisbane Airport’s New Runway Has Commenced

Published: 4 July 2019
1 Comment
Share
3 Min Read
Workers inspecting the new layer of runway pavement
Workers inspecting the new layer of runway pavement
SHARE

The construction of Brisbane’s new runway (BNR) has reached a critical milestone, with the application of asphalt – the final layer of the runway’s pavement – has commenced today.

Over the next three months, more than 100,000 tonnes of aircraft-grade asphalt will be placed on top of the runway’s 2.5 metres of compacted sand and 600-milimetre layer of fine crushed rock.

Fulton Hogan has been subcontracted by Skyway to produce a specially-designed asphalt on site that allows flexibility, load-spreading capacity, deformation resistance and the ability to withstand aircraft-induced shear stresses and high temperatures.

Paul Coughlan, Project Director, says Brisbane’s new runway is the biggest and most satisfying project he has ever been involved in.

Advertisement

“After nearly 15 years as Project Director, I am just as passionate now as I was when I started thanks to moments like this.

“Asphalt is the final layer of Brisbane’s new runway – the icing on the cake that is an internationally tried and tested runway pavement design.

Equipment being used to add the final layer of runway pavement
Equipment being used to add the final layer of runway pavement

“Given that site preparation and reclamation works for the new runway commenced way back in July 2012, it is incredibly exciting to be reaching a point where the end of construction is now in sight,” Mr Coughlan said.

Graeme Fenemore, Skyway Joint Venture Project Director, said the milestone is representative of the significant progress made to date which has been the culmination of an open and collaborative relationship between Skyway and BAC.

Advertisement

“Together we have implemented innovative engineering solutions while always putting the safety of our workforce first, proudly recording in excess of 2.2 million hours with an outstanding safety record.

“By continuing the momentum we have, I am confident the project will be delivered safely to the satisfaction of the wider community.”

Equipment being used to add the final layer of runway pavement
Equipment being used to add the final layer of runway pavement

Skyway, a joint venture (JV) between BMD Constructions Pty Ltd and CPB Contractors Pty Ltd, was awarded the Airfield Works contract in July 2017, and with around 12 months of construction to go, they have:

  • Airfield conduits and pits 90 per cent complete.
  • Modified fine crushed rock (taxiway pavement base course) 80 per cent complete.
  • Taxiway concrete (final taxiway pavement layer) more than 50 per cent complete.

Following the completion of the construction programme, the detailed commissioning process for the new ground lighting, navigational aids and control tower systems will commence.

Advertisement

Brisbane’s new runway remains on track to be operational in mid-2020.

Inside PsiQuantum’s $1 Billion Plan to Build the World’s First Useful Quantum Computer in Brisbane
Brisbane International Terminal to Get Security & Retail Upgrade
Brisbane Airport Unveils $50 Million Parcel Hub: A Game-Changer for Australia Post
Construction to Start on Brisbane Airport Carpark Expansion
BNE & Lotte to Develop Uniquely Brisbane Concept

Sign Up to BD Newsletter

Be keep up! Get the latest breaking development news delivered straight to your inbox.
By signing up, you agree to our Commenting Policy and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print
Share
What do you think?
Love0
Happy0
Surprise0
Sad0
Angry0
Previous Article Artist's impression of the proposed entry modification to Creek Street Refurbishment Proposed for Heritage Listed 308 Queen Street
Next Article TOTAL Property Group Managing Director - Adrian Parsons Apartment Developers Urged to Restock Now for Next Wave of Downsizers
1 Comment
  • Pingback: Final Layer of Brisbane Airport’s New Runway Has Commenced - TOTAL Property Group

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Stay Connected

13kFollowersLike
2kFollowersFollow
6.2kFollowersFollow
3.2kSubscribersSubscribe
LinkedInFollow
Advertisement

Latest News

Architectural rendering showing the façade detail and curved balcony forms of The Carter
Mosaic’s Second Kangaroo Point Project Secures $205M in Pre-Sales
Eastern Featured Residential
11 July 2025
Architectural rendering of the proposed Chester & Morse development showing dual tower form.
Frasers Lodges Design Change for Chester & Morse Towers in Newstead
Featured Northern Residential
6 July 2025
Architectural rendering of the external built form of the proposed Symphony project
Sherpa Unveils ‘Symphony’, a 27-Storey Tower for Cordelia Street
4101 - South Bank, South Brisbane, West End Featured Residential Southern
4 July 2025
Location of the proposed Brisbane Live Arena (left) and conceptual rendering of the original Arena at old Roma Street location
Brisbane Live Construction at Woolloongabba Could Commence by End of 2026
Brisbane 2032 Olympics Entertainment / Leisure Featured Woolloongabba / Brisbane Live Precinct
4 July 2025

Polls

Select two infrastructure projects needed most ahead of the Brisbane 2032 Olympics

View Results

Loading ... Loading ...
  • Polls Archive
//

Brisbane’s leading source of free development and infrastructure news reporting across the greater Brisbane area.

Quick Link

  • ADVERTISE WITH USNew
  • PRIVACY POLICY
  • COMMENTING POLICY
  • CONTACT US
  • MY BOOKMARK

Top Categories

  • BRISBANE DEVELOPMENT MAP
  • BRISBANE CBD
  • QUEEN’S WHARF
  • BRISBANE 2032 OLYMPICS
  • SMART GROWTH SERIES

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

Brisbane DevelopmentBrisbane Development
Follow US
© 2025 Brisbane Development Pty Ltd. All Rights Reserved
Join Us!
Subscribe to the BrisbaneDevelopment.com newsletter and never miss our latest news.
Zero spam, Unsubscribe at any time.