By using this site, you agree to the Privacy Policy and Commenting Policy.
Accept
Brisbane DevelopmentBrisbane DevelopmentBrisbane Development
  • Areas
    • Brisbane CBD
    • Northern
    • Southern
    • Eastern
    • Western
    • Gold Coast
    • Sunshine Coast
  • Search by Type
    • Residential
    • Residential BTR
    • Commercial
    • Hotel & Resort
    • Brisbane Retail
    • Entertainment / Leisure
    • Infrastructure
    • Concepts
    • Industrial
  • SEQ Development Maps
    • Brisbane Development Map
    • Gold Coast Development Map
  • Major Precincts
    • Brisbane Airport
    • Brisbane 2032 Olympics
    • Northshore Hamilton
    • Queen’s Wharf Precinct
    • Waterfront Brisbane
    • Woolloongabba / Brisbane Live Precinct
Search
  • Advertise
© 2025 Brisbane Development Pty Ltd. All Rights Reserved
Reading: Brisbane-first construction plans to build Australia’s longest green bridge
Share
Sign In
Notification Show More
Font ResizerAa
Font ResizerAa
Brisbane DevelopmentBrisbane Development
  • Areas
  • Search by Type
  • SEQ Development Maps
  • Major Precincts
Search
  • Areas
    • Brisbane CBD
    • Northern
    • Southern
    • Eastern
    • Western
    • Gold Coast
    • Sunshine Coast
  • Search by Type
    • Residential
    • Residential BTR
    • Commercial
    • Hotel & Resort
    • Brisbane Retail
    • Entertainment / Leisure
    • Infrastructure
    • Concepts
    • Industrial
  • SEQ Development Maps
    • Brisbane Development Map
    • Gold Coast Development Map
  • Major Precincts
    • Brisbane Airport
    • Brisbane 2032 Olympics
    • Northshore Hamilton
    • Queen’s Wharf Precinct
    • Waterfront Brisbane
    • Woolloongabba / Brisbane Live Precinct
Have an existing account? Sign In
Follow US
  • Advertise
© 2024 Brisbane Development Pty Ltd. All Rights Reserved
Brisbane Development > Project Type > Infrastructure > Brisbane-first construction plans to build Australia’s longest green bridge
Infrastructure

Brisbane-first construction plans to build Australia’s longest green bridge

Published: 3 September 2021
4 Comments
Share
4 Min Read
SHARE

Delivery of the fast-tracked Kangaroo Point Green Bridge is about to get underway, with hundreds of local workers to get started on piecing together the longest inner-city active travel bridge in any Australian capital city.

Lord Mayor Adrian Schrinner said residents would soon see establishment of the work sites in the CBD and at Kangaroo Point, with barges to arrive and marine piling to start in early 2022.

“This bridge is going to a major engineering and construction feat for our city and involve innovative techniques that have never been used in Brisbane before,” Cr Schrinner said.

“The construction of this green bridge will involve the best and most advanced construction techniques to ensure river access is maintained while 33 piles are installed, and the 182-metre bridge span connected.

Advertisement
Rendering of the construction of the Kangaroo Point Green Bridge
Rendering of the construction of the Kangaroo Point Green Bridge

“The Kangaroo Point Green Bridge will be the tallest bridge in Brisbane with its mast 95-metres above the Brisbane River, and we will use a combination of a 72-metre tower crane and barges to install the main pylon before installing the bridge deck spans across the river.

“This bridge is about providing better and safer active travel connections, but it’s also going to be a fantastic landmark for the 2032 Olympics and Paralympic Games.

“The combination of its striking design, boutique bar and restaurant and the critical connection from the heart of the CBD across to the main Olympic Stadium will make it incomparable to anything else in the world.

“I have no doubt it will quickly become one of the most photographed structures in Brisbane.”

Transport Civic Cabinet Chair Councillor Ryan Murphy said the Kangaroo Point Green Bridge would be city changing

Advertisement

“The Schrinner Council said we would fast-track this green bridge and the fact that we’re about to start early works is another milestone met,” Cr Murphy said.

Rendering of the construction of the Kangaroo Point Green Bridge
Rendering of the construction of the Kangaroo Point Green Bridge

“The construction plan and animation will let residents know exactly how this bridge will be built and what they can expect to see happening.

“The innovative approach to construction will use three major deck lifts to install the main spans, allowing safe access to the river to be maintained.

“This bridge will be built locally by a team of more than 300 contractors and more than 90 per cent of supplies will be sourced from South East Queensland businesses.

“We’ve come a long way in the just over two years since the Lord Mayor first announced the Green Bridges program and we are now getting ready to build this landmark bridge.”

Completion of the Kangaroo Point Green Bridge is expected in late 2023.

Advertisement

CONSTRUCTION FACTS AND FIGURES:

  • Number of piles = 33
  • Number of land piers = 2
  • Number of marine piers = 5
  • 8 spans
  • Main Span = 182.7metres
  • Mast Height is 83m above the deck level, making it the tallest Bridge within Brisbane at 95 metres above the Brisbane River
  • Number of tensioned cables = 32
  • Total bridge length = 458metres
Designs Revealed For Brisbane’s 63,000 Seat Olympic Stadium At Victoria Park
Albert Street Upgrade Opens Next Month As Mall Navigates A Shifting Retail Landscape
Major Testing Underway for New Adelaide Street Underground Busway Tunnel
Three Options on the Table for Olympic Stadium Location in Victoria Park
Colmslie Wharves to Deliver $100 Million Boost to Brisbane Economy

Sign Up to BD Newsletter

Be keep up! Get the latest breaking development news delivered straight to your inbox.
By signing up, you agree to our Commenting Policy and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print
Share
What do you think?
Love0
Happy0
Surprise0
Sad0
Angry0
Previous Article Architectural rendering of Gurner's La Pelago development Gurner Proposes Massive ‘La Pelago’ Residential Project for Surfers
Next Article Architectural rendering of proposed 9 Overend Street, East Brisbane Residential Development Proposed for Overend Street, East Brisbane
4 Comments
  • Al pearce says:
    4 September 2021 at 6:40 pm

    Nice bridge,Brisbane is growing rapidly I was surprised when I came in early 2020 to Brisbane ,this city has changed alot and more to come,I think 2023 is a golden year for Brisbane

    Reply
  • Grace says:
    5 September 2021 at 3:19 am

    The green bridges are fabulous. Brisbane is a beautiful and vibrant city with great weather that encourages an outdoor lifestyle. Sadly the new flight paths have introduced an ever present roar over the riverside suburbs that severely detracts from the city’s appeal. Hopefully the BCC is working with the federal government to address this issue.

    Reply
  • Anthony Proctor says:
    14 September 2021 at 5:35 am

    A very nice bridge with a great design. It will also look good at night time lit up. I think that end of the city will become alot more busier. A much needed crossing instead of having to walk around the long way.

    Reply
  • William Phipps says:
    29 November 2024 at 7:23 am

    When will you be constructing a bridge to Russell Island?

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Stay Connected

13kFollowersLike
2kFollowersFollow
6.2kFollowersFollow
3.2kSubscribersSubscribe
LinkedInFollow
Advertisement

Latest News

Architectural rendering of the external built form of the proposed Lantern Burleigh development at 1 and 3 West Street, Burleigh Heads.
Boutique Lantern Burleigh Project Secures DA For Mixed Use Development In Burleigh Heads
Gold Coast Residential
20 January 2026
Architectural rendering of the proposed Hamilton Grove development showing the Hamilton riverside context and proximity to Brisbane’s CBD.
Hamilton Grove Proposal Unveiled For Northshore Hamilton Site
Featured Northern Residential
20 January 2026
Concept rendering of a proposed low rise, walkable neighbourhood with six storey apartments and two to three level terrace housing set around green public spaces
The Missing Middle: Brisbane’s Two Storey City Is No Longer Affordable
Featured Smart Growth Series
11 January 2026
Architectural rendering of the corner view of the proposed Victory Hotel hotel tower, illustrating the lifted tower form above the heritage Victory Hotel building.
51 Storey Hotel Tower Proposed Above Brisbane’s Oldest Pub on Edward Street
Brisbane CBD Featured Hotel & Resort
7 January 2026

Polls

Select two infrastructure projects needed most ahead of the Brisbane 2032 Olympics

View Results

Loading ... Loading ...
  • Polls Archive
//

Brisbane’s leading source of free development and infrastructure news reporting across the greater Brisbane area.

Quick Link

  • ADVERTISE WITH USNew
  • PRIVACY POLICY
  • COMMENTING POLICY
  • CONTACT US
  • MY BOOKMARK

Top Categories

  • BRISBANE DEVELOPMENT MAP
  • BRISBANE CBD
  • QUEEN’S WHARF
  • BRISBANE 2032 OLYMPICS
  • SMART GROWTH SERIES

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

Brisbane DevelopmentBrisbane Development
Follow US
© 2025 Brisbane Development Pty Ltd. All Rights Reserved
Join Us!
Subscribe to the BrisbaneDevelopment.com newsletter and never miss our latest news.
Zero spam, Unsubscribe at any time.