By using this site, you agree to the Privacy Policy and Commenting Policy.
Accept
Brisbane DevelopmentBrisbane DevelopmentBrisbane Development
  • Areas
    • Brisbane CBD
    • Northern
    • Southern
    • Eastern
    • Western
    • Gold Coast
    • Sunshine Coast
  • Search by Type
    • Residential
    • Residential BTR
    • Commercial
    • Hotel & Resort
    • Brisbane Retail
    • Entertainment / Leisure
    • Infrastructure
    • Concepts
    • Industrial
  • SEQ Development Maps
    • Brisbane Development Map
    • Gold Coast Development Map
  • Major Precincts
    • Brisbane Airport
    • Brisbane 2032 Olympics
    • Northshore Hamilton
    • Queen’s Wharf Precinct
    • Waterfront Brisbane
    • Woolloongabba / Brisbane Live Precinct
Search
  • Advertise
© 2026 Brisbane Development Pty Ltd. All Rights Reserved
Reading: Brisbane Airport Launches Its Largest Industrial Land Release, a 30 Hectare, $400 Million Pipeline
Share
Notification Show More
Font ResizerAa
Font ResizerAa
Brisbane DevelopmentBrisbane Development
  • Areas
  • Search by Type
  • SEQ Development Maps
  • Major Precincts
Search
  • Areas
    • Brisbane CBD
    • Northern
    • Southern
    • Eastern
    • Western
    • Gold Coast
    • Sunshine Coast
  • Search by Type
    • Residential
    • Residential BTR
    • Commercial
    • Hotel & Resort
    • Brisbane Retail
    • Entertainment / Leisure
    • Infrastructure
    • Concepts
    • Industrial
  • SEQ Development Maps
    • Brisbane Development Map
    • Gold Coast Development Map
  • Major Precincts
    • Brisbane Airport
    • Brisbane 2032 Olympics
    • Northshore Hamilton
    • Queen’s Wharf Precinct
    • Waterfront Brisbane
    • Woolloongabba / Brisbane Live Precinct
Follow US
  • Advertise
© 2026 Brisbane Development Pty Ltd. All Rights Reserved
Brisbane Development > Major Precincts > Brisbane Airport > Brisbane Airport Launches Its Largest Industrial Land Release, a 30 Hectare, $400 Million Pipeline
Brisbane AirportIndustrial

Brisbane Airport Launches Its Largest Industrial Land Release, a 30 Hectare, $400 Million Pipeline

Airport Industrial Park, Tamarind Place, Brisbane Airport QLD 4008

Published: 22 October 2026
No Comments
Share
9 Min Read
Aerial photograph of Airport Industrial Park with the Stage 2 land being prepared and the airfield behind
Airport Industrial Park, with Stage 2 land being prepared beside the completed Stage 1 buildings, February 2026. Photo supplied by Brisbane Airport.
SHARE
Highlights
  • Brisbane Airport has launched the largest industrial land release in its history: 30 hectares over three years.
  • The pipeline represents more than $400 million in land preparation and building construction.
  • More than 150,000 m² will be added to an investment property portfolio valued at more than $2.6 billion.
  • Airport Industrial Park Stage 2 offers 27,000 m² for up to 10 tenants and is about 40 per cent pre-committed.
  • Stage 2 facilities target 5 Star Green Star credentials, with practical completion expected by mid 2027.
  • The airport’s industrial precincts are 100 per cent leased as Brisbane’s industrial vacancy sits at 3 per cent.

Brisbane Airport has started the largest release of industrial land in its history, a 30 hectare pipeline of industrial facilities to be developed over the next three years. The airport says the program represents an investment of more than $400 million in land preparation and building construction, and will add more than 150,000 square metres to an investment property portfolio already valued at more than $2.6 billion, up by more than $500 million in the past two years.

The release lands in one of the tightest industrial markets in the country. Brisbane’s industrial vacancy sits at 3 per cent, according to the airport, and its own industrial precincts are fully leased, with a weighted average lease expiry of 8.55 years across the portfolio. Over the past five years the airport has delivered more than 120,000 square metres of industrial floor space, and it is now home to more than 600 businesses, 200 of them leasing buildings across 450,000 square metres alongside more than 1.3 million square metres of ground leases.

Render of a two level office and warehouse concept for Lot 8B at Airport Industrial Park
The concept for Lot 8B, a 26,200 m² facility on a 5.1 hectare site. Image: Brisbane Airport. Artist impression, subject to change.

“What we’re bringing to market is one of the last opportunities of this scale in South East Queensland,” said Scott Norris, Brisbane Airport’s Executive General Manager Commercial. “The industrial vacancy story you’re seeing in headlines reflects a real squeeze on tenants, and our role is to release land in a way that meets that demand.”

The first of the new space is at Airport Industrial Park, the airport’s newest precinct, where Stage 2 was launched to market in April with 27,000 square metres of customisable facilities under development for up to 10 tenants. About 40 per cent of the lettable area is already pre-committed, construction of the first tenant facilities is due to start shortly, and practical completion is expected by mid 2027. The new buildings are targeting 5 Star Green Star rating credentials.

Advertisement
Render of the Lot 8A concept with car parking and a truck court at Airport Industrial Park
The Lot 8A concept, with 24,570 m² of building and 220 car parks. Image: Brisbane Airport. Artist impression, subject to change.

An aerial photograph supplied by the airport, taken in February, shows the Stage 2 land cleared and a new access road laid out beside the completed Stage 1 warehouses, many of them fitted with rooftop solar, with the airfield and Moreton Bay beyond. The airport describes the brownfield site as having direct access to South East Queensland’s major industrial corridors to the north, south and west, and says it will work with each tenant and their stakeholders to shape the development to their operations.

Brisbane Airport’s leasing listings show concept designs for six Stage 2 lots along Tamarind Place, from 2.2 hectares on Lot 6 to 7.1 hectares across Lots 13 and 14. The concepts pair two level offices, finished in dark cladding with timber-look screens, with large warehouses and truck courts, and range from 10,957 square metres of building on Lot 6 to 39,345 square metres on Lots 13 and 14, with between 126 and 410 car parks. Tomkins Commercial is listed as builder for Lots 5 and 8B, which carry concepts of 11,195 and 26,200 square metres.

Render of the corner office for the Lot 6 concept at 7 Tamarind Place
The office corner of the Lot 6 concept at 7 Tamarind Place. Image: Brisbane Airport. Artist impression, subject to change.
Render of loading docks and a truck court for the Lot 6 concept
Loading docks and a truck court on the Lot 6 concept. Image: Brisbane Airport. Artist impression, subject to change.

Stage 1 of Airport Industrial Park is already home to 4WD SupaCentre, Aramex, Australia Post, Martin Brower, Sadleirs and Tile One. Australia Post’s $50 million parcel hub, with direct airside access, was announced for the precinct in 2024.

The airport is pitching the new land at logistics, warehousing and advanced manufacturing operators competing for scarce industrial sites. Tenants are offered 24/7 operations, direct access to the Gateway Motorway and major arterial roads, proximity to the airfield, custom-built facilities and lease terms of seven years or more.

Render of a warehouse concept for Lot 7 at 11 Tamarind Place from the street
The Lot 7 concept at 11 Tamarind Place, offered in a range of building sizes. Image: Brisbane Airport. Artist impression, subject to change.

The industrial rollout sits within Future BNE, the airport’s $5 billion investment program covering more than 150 projects across Brisbane Airport over the next five years, and forms part of a plan to manage 420 hectares of airport land over the next decade. Earlier this year the airport also announced two new hotel sites as it prepares for growth ahead of the 2032 Olympic and Paralympic Games.

Advertisement
Aerial concept render of the Airport Industrial Park Stage 2 lots
An aerial concept of the Airport Industrial Park Stage 2 lots. Image: Brisbane Airport. Artist impression, subject to change.

We’re invested in a long-term vision to deliver connectivity, innovation and sustainable growth through precincts designed for businesses today and into the future. This rollout is part of our plan to sustainably manage 420 hectares over the next decade as Brisbane continues to evolve.

Scott Norris, Executive General Manager Commercial, Brisbane Airport

Project Rundown

Development ParameterProposed Development
AddressAirport Industrial Park, Tamarind Place, Brisbane Airport QLD 4008
ProjectBrisbane Airport industrial land release, including Airport Industrial Park Stage 2
Land Release30 hectares over three years (about 42 soccer fields)
InvestmentMore than $400 million in land preparation and building construction
New Floor SpaceMore than 150,000 m² added to the airport’s investment property portfolio
Stage 227,000 m² of customisable facilities under development for up to 10 tenants; about 40 per cent pre-committed
Stage 2 LotsLots 5, 6, 7, 8A, 8B and 13/14, from 22,427 m² to 71,389 m²; concept buildings from 10,957 m² to 39,345 m²
StatusStage 2 launched to market in April 2026; construction of the first tenant facilities due to start shortly; practical completion expected by mid 2027
Lease TermsSeven years or more
SustainabilityFramework: The new Airport Industrial Park Stage 2 facilities are targeting 5 Star Green Star rating credentials.
Movement: Direct access to the Gateway Motorway and major arterial roads, with 24/7 operations and proximity to the airfield.
Stage 1 Tenants4WD SupaCentre, Aramex, Australia Post, Martin Brower, Sadleirs and Tile One
Industrial Portfolio100 per cent occupied; weighted average lease expiry of 8.55 years; more than 120,000 m² delivered in the past five years
ProgramPart of Future BNE, Brisbane Airport’s $5 billion program of more than 150 projects over five years
DeveloperBrisbane Airport Corporation
BuilderTomkins Commercial (listed for Lots 5 and 8B)

Brisbane Airport Corporation has operated Brisbane Airport since 1997 under a long-term lease from the Australian Government. Beyond the terminals and runways, its commercial property team develops and leases the airport’s non-aviation land, which spans industrial and logistics estates, the Skygate retail and entertainment precinct, offices and hotels, and is home to more than 600 businesses.

Aerial photograph supplied by Brisbane Airport, February 2026. Renders of Airport Industrial Park Stage 2 by Brisbane Airport; artist impressions only and subject to change.

Anthropic Joins $32 Billion Western Downs Digital Park West of Brisbane
Ipswich primed to be Queensland’s manufacturing and defence capital
Brisbane Airport to Expand Hotel Offering with Two New Sites
Electrolux Distribution Hub Wins Top Sustainability Honour
Inside PsiQuantum’s $1 Billion Plan to Build the World’s First Useful Quantum Computer in Brisbane
TAGGED:Airport Industrial ParkBrisbane AirportBrisbane Airport CorporationFuture BNEindustriallogisticsTamarind PlaceTomkins Commercialwarehouse

Sign Up to BD Newsletter

Be keep up! Get the latest breaking development news delivered straight to your inbox.
By signing up, you agree to our Commenting Policy and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Email Copy Link Print
Share
What do you think?
Love0
Happy0
Surprise0
Sad1
Angry0
Previous Article Artist impression of the proposed public realm at East Village, Cannon Hill Anthony John Group Lodges a $1.5 Billion Masterplan for East Village, Cannon Hill
Next Article Artist's rendering of proposed Future South Bank - Parkland Core South Bank Seeks Private Sector Partners for New Lagoon and 4.8 Hectare Revitalisation
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Stay Connected

13kFollowersLike
2kFollowersFollow
6.2kFollowersFollow
3.2kSubscribersSubscribe
LinkedInFollow
Advertisement

Latest News

The 25 metre lap pool at Exhibition Place in Bowen Hills at sunset
Exhibition Place Opens: Lendlease and QuadReal’s New Build-to-Rent Tower Welcomes First Residents at Bowen Hills
Bowen Hills Northern Residential BTR
4 November 2026
Artist impression of the proposed Halo crown in South Brisbane with the Brisbane CBD skyline behind
Halō Gets a New Crown and a Wellness Rooftop as Kiō Reworks Its South Brisbane Tower
Residential BTR Southern
29 October 2026
Render of the twin wings of NALU from Marine Parade, Miami
Three NALU Beachfront Residences Sell for Up to $14.5 Million at Miami
Gold Coast Residential
26 October 2026
The rooftop stair and city views, Sanctuary Residences, South Brisbane
Inside Aria’s Sanctuary Residences: $519 Million in Sales and Seven Levels of Amenity on Melbourne Street
4101 - South Bank, South Brisbane, West End Featured Residential Southern
24 October 2026

Polls

Select two infrastructure projects needed most ahead of the Brisbane 2032 Olympics

View Results

Loading ... Loading ...
  • Polls Archive
//

Brisbane’s leading source of free development and infrastructure news reporting across the greater Brisbane area.

Quick Link

  • ADVERTISE WITH USNew
  • PRIVACY POLICY
  • COMMENTING POLICY
  • CONTACT US
  • MY BOOKMARK

Top Categories

  • BRISBANE DEVELOPMENT MAP
  • BRISBANE CBD
  • QUEEN’S WHARF
  • BRISBANE 2032 OLYMPICS
  • SMART GROWTH SERIES

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

Brisbane DevelopmentBrisbane Development
Follow US
© 2026 Brisbane Development Pty Ltd. All Rights Reserved
Join Us!
Subscribe to the BrisbaneDevelopment.com newsletter and never miss our latest news.
Zero spam, Unsubscribe at any time.